Weather dictates work
June 29, 2016 12:00 am
• Last Updated: June 29, 2016 3:21 pm
This is in response to the letter, “Ill-timed water work along Pequot Ave.,” (June 26). Unfortunately, the road work has to be done in the summer. Below a certain temperature asphalt cannot be produced to repair the road bed. This information comes through the water department.
Jane Price
New London