Mystic bridge closure delayed due to storm
March 06, 2013 10:00 am
• Last Updated: March 06, 2013 5:08 pm
Mystic - The Mystic River Bridge closing has been rescheduled to start at noon Monday and continue through March 13th because of the impending storm, a state Department of Transportation spokesman said today.
The planned 54-hour closing was scheduled to start today. The temporary closure is required to install a vehicle barrier gate system that spans Route 1 on the Stonington side of the bridge.
Comment threads are monitored for 48 hours after publication and then closed.